Industrial Furnace Construction Pre-Installation Work

Features

Pre-Installation Work Reduces the Customer’s Burden

By implementing refractory lining and assembling in advance as much as possible at its own factory, HIROCHIKU reduces the amount of work at the delivery destinations, thus shortening the total period of construction work.

Large-Scale Facilities for Pre-Installation Work

HIROCHIKU has a factory building that is large enough to assemble industrial furnace plant facilities at once, as well as overhead crane equipment that assumes the weight of a refractory after construction.

Total Manufacturing System Covering Logistics

HIROCHIKU’s factory is located near Himeji Port. HIROCHIKU ships goods nationwide by sea transport as well as land transportation.

Appearance of Product Center
Appearance of Product Center
Inside Product Center
Inside Product Center
Inside Product Center
Inside Product Center

Product Center Overview

Work at Product Center

Work at Product Center

Appearance of Product Center

Appearance of Product Center

Crane Three-Dimensional Figure

Crane Three-Dimensional Figure

Factory Building Floor: 20,000×75,000mm
Crane: Three Rated Load: 4,800kg Rated Load: 25,000kg/10,000kg Rated Load: 4,800kg

Sub Center Overview

Sub Center Apperance
Factory Building Floor: 35,000×15,000mm
Crane [1] Rated Load: 5,000kg [2] Lift: 6,600mm [3] Effective Span: 10,700mm [4] Total Running Length: 32,500mm [5] Operation Method: Floor Push Button Type
Crane [1] Rated Load: 2,800kg [2] Lift: 6,000mm [3] Effective Span: 12,100mm [4] Total Running Length: 32,500mm [5] Operation Method: Floor Push Button Type
Factory Building Floor: 41,000×18,000mm
Crane [1] Rated Load: 25,000kg/5,000kg [2] Lift: 9,078mm/9,968mm [3] Effective Span: 13,000mm [4] Total Running Length: 36,000mm [5] Operation Method: Floor Push Button Type
Crane [1] Rated Load: 4,800kg [2] Lift: 9,349mm [3] Effective Span: 14,736mm [4] Total Running Length: 35,000mm [5] Operation Method: Floor Push Button Type
Drying Equipment
[1] Dimensions (Inside Dimensions): W2,900×L2,000×H1,450mm [2] Dried Product: Up to 6 Tons [3] Temperature: 0~600℃(MAX)25℃/h(MAX) [4] Maximum Combustion Volume: 138.5kw

Business Execution

Pre-Installation Work on Continuous Heat Treatment Furnace

Plan

HIROCHIKU thoroughly confirms and reports the progress of our work at our own factory.

Construction Site

Our standardized, careful work supports quality.

Shipment

This is followed by equipment installation, construction, adjustment, and testing at the delivery destination.